Process Engineering

Ultrasonic welding machine

Type of equipment:Power soft pack battery assembly service
Focusing on various energy storage business needs, TIES strives to develop into a comprehensive, market-oriented R&D enterprise that integrates testing analysis, failure analysis, qualification certification, technology development, engineering amplification, intelligent manufacturing, high-value information services, and high-end training. Contact us

Process Environment

Dew Point: -50℃

Dust: 100,000-grade


Equipment Capability Parameters

  1. Positioning accuracy of tab welding: ±0.5mm (accuracy from the welding position to the edge of the battery cell);

  2. The welding point distance to the battery cell position is adjustable, with one-time welding completion. The welding position has a dust removal mechanism to perform dust suction simultaneously during welding. It has the function to detect whether welding has occurred;

  3. Pre-welding machine: Welding area 6mm×3mm, tab cutting length accuracy ±1 mm;

  4. Final welding machine: Welding area 15mm×4mm, flexible connection thickness: single-layer positive ≤0.3mm, single-layer negative ≤0.3mm, double-layer positive ≤0.6mm, double-layer negative ≤0.6mm, maximum number of battery cell tab layers is 80.


CopyRight © 2024 Tianmu Lake Institute of Advanced Energy Storage Technologies All Rights Reserved. 苏ICP备18030956号-1